11. Cost of Design and Organization of Production Of Flying Vehicles 'EKIP" ($ Million)

 
Name of Stage of Development Model of Flying Vehicle "EKIP"
L2-3 L3-1 L3-2
1. Research works 21.5 44.57 180
2. Design and development 80.96 171.16 1166
3. Manufacture of prototype models for testing 28.28 69.29 520
4. Flight tests, certification, im­provement of assemblies and sys­tems 45.0 93.71 452
5. Preparation of series production 124.25 245.27 1788
6. Total costs of design and devel­opment and preparation of series production 300 624 4106

 

1.
Description of Flying Vehicles "EKIP"
2.
Basic Technical Concepts of the "EKIP" Project
3.
Patents
4.
Basic Advantages of Flying Vehicles "EKIP" Compared to Traditional Airplanes
5.
CONDITION OF WORKS ON ZAO "AC "EKIP" PROJECT
6.
GOVERNMENTAL SUPPORT OF "EKIP" PROJECT
7.
AUTOMATIC CONTROL PATROL AND RECONNAISSANCE FLYING VEHICLES "EKIP-AULA L2-3"
8.
AUTOMATIC CONTROL PATROL AND RECONNAISSANCE FLYING VEHICLES "EKIP-2"
9.
On base of "EKIP-2" may be manufactured two-plases apparat with parameters
10.
FLIGHT AND TECHNICAL CHARACTERISTICS OF "EKIP" FLYING VEHICLES
11.
Cost of Design and Organization of Production Of Flying Vehicles 'EKIP" ($ Million)
12.
Schedule of Implementation of Program "Flying Vehicles "EKIP". Volume of Production
13.
Schedule of Implementation of Project "EKIP L2-3". Costs, Payback $M
14.
Schedule of Implementation of Project "EKIP L3-1". Costs, Payback $M
15.
Schedule of Implementation of Project "EKIP L3-2". Costs, Payback $M