15. Schedule of Implementation of Project "EKIP L3-2". Costs, Payback $M

 
Basic Stages of Implementa­tion of Project "EKIP L3-2" (takeoff weight 360 1.) by years 1st year 2nd
year
3rd
year
4th
year
5th
year
6th
year
7th year 8th year 9th year 10th year 11th
year
12th year 13th year 14th
year
15th
year
Scientific research works 90 90                          
Design and development works 66 600 500                        
Manufacture of mockup and 3 prototype aircrafts for test­ing     200 320                      
Flight tests, certification, de­sign improvement       250 202                    
Preparation of series produc­tion       188 500 400 400 300              
Series production of flying vehicles, pcs per year         2 4 6 8 10 14 20 30 30 40 40
Costs of research and devel­opment, preparation of series production 156 690 700 758 702 400 400 300              
Costs of series production of flying vehicles         336 672 1008 1344 1680 2352 3360 5040 5040 6720 6720
Annual sales volume         560 1120 1680 2240 2800 3920 5600 8400 8400 11200 11200
Annual profit                   822 2240 3360 3360 4480 4480
Accumulated profit from im­plementation of project                   822 3062 6422 9782 14268 18742

 

Payback period of the Project - 9.5 years.

 

1.
Description of Flying Vehicles "EKIP"
2.
Basic Technical Concepts of the "EKIP" Project
3.
Patents
4.
Basic Advantages of Flying Vehicles "EKIP" Compared to Traditional Airplanes
5.
CONDITION OF WORKS ON ZAO "AC "EKIP" PROJECT
6.
GOVERNMENTAL SUPPORT OF "EKIP" PROJECT
7.
AUTOMATIC CONTROL PATROL AND RECONNAISSANCE FLYING VEHICLES "EKIP-AULA L2-3"
8.
AUTOMATIC CONTROL PATROL AND RECONNAISSANCE FLYING VEHICLES "EKIP-2"
9.
On base of "EKIP-2" may be manufactured two-plases apparat with parameters
10.
FLIGHT AND TECHNICAL CHARACTERISTICS OF "EKIP" FLYING VEHICLES
11.
Cost of Design and Organization of Production Of Flying Vehicles 'EKIP" ($ Million)
12.
Schedule of Implementation of Program "Flying Vehicles "EKIP". Volume of Production
13.
Schedule of Implementation of Project "EKIP L2-3". Costs, Payback $M
14.
Schedule of Implementation of Project "EKIP L3-1". Costs, Payback $M
15.
Schedule of Implementation of Project "EKIP L3-2". Costs, Payback $M

 

Copyright© 2001-2004 Aviation Concern "EKIP"