14. Schedule of Implementation of Project "EKIP L3-1". Costs, Payback $M

Basic Stages of Implementa­tion of Project "EKIP L3-1" (takeoff weight 45 t.) by years 1st year 2nd
year
3rd
year
4th
 year
5th
year
6 th
year
7 th
year
8th
year
 9 th
year
10th
year
11th year 12th year 13th
year
14th
year
15th
year
Scientific research works 44.57                            
Design and development works 101.28 69.88                          
Manufacture of mockup and 3 prototype aircrafts for test­ing   50.12 19.17                        
Flight tests, certification, de­sign improvement     45.13 48.58                      
Preparation of series produc­tion     50.13 87.5 77.5 30.14                  
Series production of flying vehicles, pcs per year       3 5 10 20 30 40 50 60 70 75 80 85
Costs of research and de­velopment, preparation of series production 145.85 120 114.43 136.08 77.5 30.14                  
Costs of series production of flying vehicles       60.75 101.3 202.5 405 607.5 810 1012.5 1215 1475.5 1519 1620 1721.25
Annual sales volume       119.25 198.8 397.5 795 1192.5 1590 1987 2385 2782.5 2981.25 3180 3378.75
Annual profit             117 5.85 780 975 1170 1307 1462.25 1560 1657.5
Accumulated profit from im­plementation of project             117 702 1482 2457 3627 4934 6396.25 7956.3 9613.75

Payback period of the Project - 6.5 years.


1.
Description of Flying Vehicles "EKIP"
2.
Basic Technical Concepts of the "EKIP" Project
3.
Patents
4.
Basic Advantages of Flying Vehicles "EKIP" Compared to Traditional Airplanes
5.
CONDITION OF WORKS ON ZAO "AC "EKIP" PROJECT
6.
GOVERNMENTAL SUPPORT OF "EKIP" PROJECT
7.
AUTOMATIC CONTROL PATROL AND RECONNAISSANCE FLYING VEHICLES "EKIP-AULA L2-3"
8.
AUTOMATIC CONTROL PATROL AND RECONNAISSANCE FLYING VEHICLES "EKIP-2"
9.
On base of "EKIP-2" may be manufactured two-plases apparat with parameters
10.
FLIGHT AND TECHNICAL CHARACTERISTICS OF "EKIP" FLYING VEHICLES
11.
Cost of Design and Organization of Production Of Flying Vehicles 'EKIP" ($ Million)
12.
Schedule of Implementation of Program "Flying Vehicles "EKIP". Volume of Production
13.
Schedule of Implementation of Project "EKIP L2-3". Costs, Payback $M
14.
Schedule of Implementation of Project "EKIP L3-1". Costs, Payback $M
15.
Schedule of Implementation of Project "EKIP L3-2". Costs, Payback $M

 

Copyright© 2001-2004 Aviation Concern "EKIP"